1021 DR Tuesday EngFit MOET TechSup
Topic outline
-
-
File
All Learners must complete at least two site supervisor forms for practical activities within the PETA training area at Havant. The learner will be given this responsibility by the instructor and forms should be added to Unit 002 of the learners evidence folder.
-
Folder
-
Folder
Assignments 1 and 2
-
File
Circuits
-
AUEC2-009 L2 Foundation Competence Knowledge Questions V2 2021
USE THIS ONE (newest version)
-
Please read this Introduction to Basic electrical Installation
-
Book
Useful Information
-
Electrical Conductivity of Materials
-
Automatic Disconection of supply
includes Insulation, Earthing and (OCPD overcurrent protective devices)
Earth fault Loop Zs
-
To evaluate risk and safe working practices during workshop activities and assessments.
-
The Secret to a Successful Crimp
Wire Prep - In order to properly place a wire in a terminal, the wire insulation must fi rst
be stripped to the proper length based on the terminal specifications. If the insulation is
cut too short or too long, the wire will not be seated properly into the wire barrel, causing
terminal separations or shorting